The owners needed more room for a growing family. We framed a rear addition and tied it into the existing structure so the old and new rooms feel like one house.

Engineered beams were installed where the old rear wall came out.

What we did

  • Foundation tie-in
  • Floor and wall framing
  • Roof framing and sheathing
  • Window and door openings

How the build went

  1. Layout and footings
  2. Floor system
  3. Walls
  4. Roof
  5. Sheathing and inspection