Aujla Construction

Services / Basement development

Basement development

Turn unused basement space into bedrooms, living areas or rental-ready suites.

Basement development

A finished basement can add a family room, extra bedrooms or a separate suite. The details matter: moisture, ceiling height, egress windows, fire separation and sound between floors.

We plan those details before the first wall goes up so the space is comfortable and meets code.

What is included

  • Framing, insulation and drywall
  • Bedrooms, bathrooms and kitchens
  • Separate entrances for suites
  • Help with permit paperwork

A good fit if

  • You want more living space without moving
  • You want a suite for family or a tenant
  • Your basement is unfinished or poorly finished

How it works

  1. Step 1

    Measure and check ceiling height, windows and mechanicals

  2. Step 2

    Agree layout, permits and budget

  3. Step 3

    Frame, rough-in, insulate and board

  4. Step 4

    Finish, inspect and hand over

Basement development example 1Basement development example 2

Questions about basement development

Do I need a permit for a basement suite?

A secondary suite needs permits in Calgary. We help prepare the paperwork and book inspections.

Can you add a separate entrance?

Often yes, depending on your lot and the foundation. We check during the site visit.

Related projects